Our Projects
Projects have been implemented in several fields, including high-density polyurethane (HDPE) system for lining treatment tanks and oil evaporation basins, waterproofing systems for surfaces exposed to rain water, epoxy flooring systems for industrial and service facilities and a polyurea system that exceeds the design parameters of engineering projects.
Epoxy Flooring Work
olive oil factory.
Area: 4200 square meters.
System type: Similis.
Epoxy is a chemical compound, one of the most severe types of chemical adhesives to floors, durable in terms of resistance to friction, and resistance to chemicals, whether acids, bases or solvents, as it forms as an insulating layer when dry, it is not capable of accumulating dust, water, dirt and microbes.
Year of implementation: 2020.
Execution time: 45 days.
Epoxy and primer European facility.
Evaporation Tank Lining And Insulation
Project owner: Al-Zawiya Oil Refinery.
Number of tanks: 1 tank.
Tanks dimensions 100m * 70m.
Quantity 7000 m2, thickness 1.5 mm.
The basin is completely insulated with high-density polyethylene, and the basins are used to separate oil and water, after which the oil is treated in order to preserve the environment.
Year of implementation: 2015.
Execution time: 20 days.
Evaporation Tank Lining And Iinsulation
Evaporation tank lining and insulation
Year of implementation: 2014
Project Contractor: Comet Oil Services Company
Number of tanks: 1 tank.
Tanks dimensions 120m * 120m
Quantity 16000 m2, thickness 1.5 mm.
The basin is completely insulated with high-density polyethylene, and the basins are used to separate oil and water, after which the oil is treated in order to preserve the environment.
Commercial Building Insulation
Project area: 550 square meters.
System: Acrylic system to protect the surface from water.
Implementation year: 2021.
Lining and Insulation Foundation of Building Investment
project owner : Investment Company The Purpose of the lining to protect and Preserve the foundation of the Building from corrosion and Extend the Life of the Building.
Implementation Date: 2014.
Period of Execution: 7 Days.
Ras Lanuf Lined Evaporation Ponds
project owner : Harouge Oil Operation.
Number of Tanks ( 2 ) Ponds.
Dimensins of Pond 120 m X 120 m.
Quantity of HDPE Sheet used 70,000m2 Thickness of Sheet 1.50mm.
purpose of Project is Preservation of The environment.
Implementation Date: 2010.
Period of Execution: 20 Days.
Lining And Insulation Of Earth Reservoir For Water Treatment
project owner : Implementation of Housing and utilities Projects Authority.
Dimensins of Reservoir 258 m x 121 m.
Quantity of HDPE Sheet used 46,500 m2.
Thickness of Sheet 1.50mm.
Water is used To Irrigate public gardens and parks.
Implementation Date: 2014.
Period of Execution: 30 Days.
Lining And Insulation Of Concrete Water Tank
project owner : Implementation of Housing and utilities Projects Authority.
Dimensins of Tank 110 m x 60 x 6 hight.
Quantity of HDPE Shet used 7000m2 Thickness of Sheet 1.00mm.
Water used for drinking.
Implementation Date: 2014.
Period of Execution: 20 Days.
Lining And Insulation Of earth Reservoir For Treated Water From Seweage Plant
project owner : ministry of Agriculture.
Number of Tanks ( 2 ).
Dimensins of Tank 160 m x 155 m.
Quantity of HDPE Sheet used 51,500 m2.
Thickness of Sheet 1.50mm.
Water Treatment used To Irrigate Agriculture project.
Implementation Date: 2013.
Period of Execution: 30 Days.
Lining And insulation Of Concrete Water Tanks
project owner : man-made river project.
Number of Tanks: ( 7 ).
Dimensins of Tank 220 m X 120 m 6 hight.
Size of Tank 90,000 Meter cube.
Quantity of HDPE sheet used 180,000 m2.
Thickness Of Sheet 1,00 mm.
Water is used to irrigate Farms.
Lining and Insulation Of Earth Reservoir For Water From Seweage Plant
project owner : Implementation of Housing and utilies Project s Authority.
Number of Tanks ( 2 ).
Dimensins of Tank 135 m X 595 m.
Quantity of HDPE Sheet used 105,000 m2.
Thickness of Sheet 1.50mm.
Implementation Date: 2010.
Period of Execution: 60 Days.
Lining And Insulation Of Concrete Water Tank (Project Abu Zayan – Rahibat)
project owner : man-made River Project.
Number of Tanks: ( 4 ).
Quantity of HDPE Sheet used 20,000m2 Thickness of Sheet: 1.00mm.
Water is used for lrrigatr Farms.
Implementation Date : 2009.
Period of Execution : 25 Days.