Protection and insulation system for corridors and stairs floors at Tripoli International Stadium
- Year of implementation: 2024
- The project to protect and isolate the floors of corridors and stairs at Tripoli International Stadium was implemented with great success, despite the technical challenges and problems faced by the work team during implementation. Thanks to the fruitful cooperation between the Support Company for Contracting and Real Estate Investment and the supervising consulting team from Al-Banyan Office, in addition to the implementing team from Ozone Libya Company, precise technical solutions were found for all challenges.
- One of the most important aspects of this project was the implementation of expansion joints, which were carried out with precision and high craftsmanship according to the highest technical standards and specifications approved by the consulting office. This project is an example of dedication to achieving quality and mastery in the implementation of engineering works.