loader image

Ras Lanuf Lined Evaporation Ponds

  • project owner : Harouge Oil Operation.
  •  Number of Tanks ( 2 ) Ponds.
  • Dimensins of Pond 120 m X 120 m.
  • Quantity of HDPE Sheet used 70,000m2 Thickness of Sheet 1.50mm.
  •  purpose of Project is Preservation of The environment.
  •  Implementation Date: 2010.
  • Period of Execution: 20 Days.

Leave a Comment

Your email address will not be published. Required fields are marked *

error: Content is protected !!